Project Address** Required for calculate distance-based LEED credit (MR5).
|
Project Address** Required for calculate distance-based LEED credit (MR5).
|
| Product Name |
Manufacturing Plant Location |
Total Material Cost |
Action |
|---|
** Verify with product distributor for plant location. "(Number)" indicates approximated distance from your project location to manufacturing plant.
^ Total Material Cost is cost of materials excluding installation.
• The above information is the values for that specific product from the selected manufacturing location average for the previous Quarter, values change from plant to plant and even day to day at any one plant due to availability. LEED® is a registered trademark of the U.S. Green Building Council.